407 Steeles Avenue Works Yard

407 ETR Concession Company Limited

Project Value: $30 million

This project consisted of three consecutive phases undertaken to expand and improve the 407 ETR main patrol yard. The three phases of work are as follows:

Phase 1 of the project included site grading, placement of granular subgrade material, erosion and sediment control measures, and installation of electrical infrastructure, temporary hot fences and lighting.

Phase 2 of the project includes ramp widenings, large scale precast culvert installation, linear and full-scale electrical infrastructure, underground stormwater management tanks, and a covered hot fence and maintenance building facility.

Phase 3 of the project includes linear and full-scale electrical infrastructure, signalized intersections, and a salt dome building facility.

Previous Project

All Projects

Next Project

Looking to get in touch with our team?

BTE offers services in transportation planning, design, and construction in both the public and private sectors, using our hands-on approach that stands out in today’s consulting profession.

Contact Us