Mineral Road, Maitland Drive and Farnham Road Reconstruction and Contract Administration
City of Belleville
Project Value: $11 Million
This project demonstrates the team’s ability to deliver a complete road reconstruction from design through construction.
This road reconstruction and widening project included a roundabout, installation of sanitary, storm sewer and watermain, precast concrete box culvert, and retaining wall. BTE completed both the design, permitting, inspection and Contract Administration.
The work in 2018 involved road reconstruction of Mineral Road and Maitland Drive with underground servicing and pavement to base asphalt elevation, and construction of an armour stone retaining wall. An existing corrugated steel arch pipe crossing Maitland Drive was replaced with a 3.6 x 1.8 x 25.0 m precast concrete box culvert. Sidewalk construction and boulevard restoration also commenced in 2018. Work in 2019 included road work and underground installations on Maitland Drive, as well as construction of a roundabout at Farnham Road.
Looking to get in touch with our team?
BTE offers services in transportation planning, design, and construction in both the public and private sectors, using our hands-on approach that stands out in today’s consulting profession.